Flexible batts and stuffing fibre
Fibre products can fill suitable cavities. Batts are cut to fit; stuffing material is installed to product instructions. Density, gaps and the declared application matter.
KLIMAFELD · Knowledge
Start with the construction, then choose the insulation. Compare fibre products and possible applications, including moisture, fire performance and the complete wall assembly.
Fibre products can fill suitable cavities. Batts are cut to fit; stuffing material is installed to product instructions. Density, gaps and the declared application matter.
Loose material is not automatically a blowing product. Mechanical installation requires a product, density, settlement performance and method approved for the particular cavity.
An insulation board is not automatically a render carrier or part of an external thermal insulation composite system (ETICS). Exterior use, fixings, reinforcement and render must belong to the evidenced system.
Hemp-lime combines shiv with mineral binder. Installation, construction moisture and material values cannot be transferred from flexible fibre batts.
Suitable fibre products may fill the cavities. Design junctions, airtightness, moisture control and external weather protection as a complete assembly.
Investigate condition and moisture sources first. Internal insulation changes temperature and moisture behaviour; reveals, floor junctions and timber joist ends need coordinated details.
Check whether the facade may be altered and assess the substrate, fixings and edges. Use hemp products only within an evidenced exterior wall or facade system.
Beige: insulation · Brown: timber · Grey: existing fabric · Orange: position of the insulation being considered. Original schematic illustration – not a complete layer sequence or construction specification.
Between rafters or joists, installation and junctions differ from those beneath a loaded floor. Check the declared application, loads, airtightness and settlement; suitability for a wall does not automatically cover a roof or floor.
Resolve water sources first. Neither vapour permeability nor natural fibre content replaces a working moisture design.
A product’s reaction to fire and a wall’s fire resistance are different measures. Linings, junctions and installation form part of system assessment.
Sound absorption by insulation is not the sound insulation of a whole wall. Consider mass, decoupling, junctions and flanking transmission.
Compare EPDs using an appropriate function, quantity and system boundary. Include binders, additives, transport, service life and end of life; stored biogenic carbon alone is insufficient.
Thermal conductivity λ describes a material in W/(m·K). A U-value describes heat transfer through the complete building element in W/(m²·K). A low λ-value is therefore not a complete wall assessment.
Assume a homogeneous insulation layer with d = 0.16 m and λ = 0.040 W/(m·K). Its thermal resistance is R = d / λ = 4.00 m²·K/W. If we assume, purely for illustration, R = 0.50 m²·K/W for all other layers and surface resistances combined, U = 1 / (4.00 + 0.50) ≈ 0.22 W/(m²·K).
The 0.50 is an assumption, not a property of a particular wall. Timber fractions, thermal bridges, gaps and fixings are not calculated here. The appropriate design conductivity and complete building element must be determined for the real project.
Product reference: page 4 of the THERMO HANF COMBI JUTE EPD states λD = 0.040 and a design value of 0.041 W/(m·K). This example uses the declared value for explanation, not as a design recommendation. These values do not apply to all hemp products. EPD · PDF
No. Loose material and a tested blowing product are not interchangeable. Use a product suitable for the process and building element.
No. Type and position depend on construction, climate and use; there is no single membrane recommendation for every assembly.
No. Existing fabric, driving rain, rising or other moisture and proposed junctions must be assessed first.
No. Composition and additives differ; consult the specific product declaration.